Formee — a manufacturer of expanded clay (LECA) concrete precast elements
We make precast elements that speed up construction.
- Repeatable build quality
- On-time, predictable process
- Partnership throughout delivery
We deliver more than 500 projects a year — from single-family houses, through multi-family housing, to industrial and logistics facilities.
We work in a structured, predictable way — combining BIM technology with precise precast production and efficient logistics.
Our precast elements support projects with demanding technical and commercial requirements. We design buildings that are durable, functional and energy-efficient, in line with the principles of sustainable development.
Technology reinforces our experience, providing solutions that are reliable and controlled at every stage of delivery.

Numbers that speak for themselves
Key figures describing Formee's operations and production capacity.
- projects a year
- 500+
- m³ of concrete a year
- 35 000
- elements a month
- 2 000
- to quote a project
- ~7 days
A simple process. Predictable delivery.
01
Analysis and design
We establish the requirements, select the right solutions and model every project in Tekla Structures: shop drawings, reinforcement schedules and production data all come from one model.
02
Production
Precast production under controlled conditions for repeatable element quality.
03
Transport
Logistics matched to the programme and to unloading conditions on site.
04
Installation and handover
Professional installation and support through to project handover.
Production facilities that deliver quality.
- Continuous quality control
- Repeatability and precision
- Logistics matched to your programme
The Międzyrzecz plant: commissioned in 2022, designed for automation
The factory was built from scratch on a site in Międzyrzecz, a hundred kilometres from the German border. The decision to build was taken in 2021 and production started in 2022. The batching plant was supplied by MCT Italy and the line equipment by EBAWE Anlagentechnik of the Progress Group; both companies described the investment in their own publications, linked below.
Every element is made in one place: solid and sandwich walls in normal-weight and expanded-clay concrete, filigree and solid slabs, balconies, beams, columns, plus stairs and reinforcement on automated lines. Every project is modelled in Tekla Structures and the model data drives production.
- Commissioning
- 2022, investment of about EUR 20 million
- Production capacity
- 35,000 m³ or 200,000 m² of elements a year
- Batching plant
- MCT Italy: 5 aggregate hoppers of 40 m³, 3000/2000 planetary mixers, 3 cement silos of 100 t, 3,000 l flying bucket
- Line equipment
- EBAWE Anlagentechnik (Progress Group)
- Production lines
- solid and sandwich walls, balconies, filigree and solid slabs, beams and columns, automated stair and reinforcement production
- Design
- Tekla Structures, 100% of projects in BIM
- Certificates
- CE and Nordcert since 2022
Publications about the plant
Descriptions of the plant written by trade editors and technology suppliers, outside our website.
BFT International · 05/2023
MCT Italy equipped one of the most automated factories in West PolandBFT International (DE) · 05/2023
MCT Italy belieferte eines der am stärksten automatisierten Werke in WestpolenCPi worldwide · 03/2024
Batching plant for new automated precast factory in western PolandMCT Italy
One of the most automated factories in western Poland
Applications
Residential construction
Single-family houses and multi-family buildings.
Industrial construction
Industrial halls, warehouses, offices, retail buildings, stations and car parks.
Agricultural construction
Silos, pig houses and poultry houses.
Other areas
Other applications across the wider construction sector.
Benefits
More benefits of precast construction
- Shorter overall project delivery time.
- High quality of finished surfaces.
- No plastering required.
- Thinner walls with the same performance give up to 7% more usable floor area without increasing the building footprint — the result of our calculations for completed projects; the difference depends on the design and the wall build-up.
- High fire resistance of precast elements.
- Greater resistance to aggressive biological and chemical environments.
- Fast installation of elements, whatever the weather conditions.
- The flexibility of the precast system means even the most complex designs can be built.
- Finished walls arrive on site with window and door openings and integrated ring beams.
- Precast elements are ready to be connected to one another as soon as they are unloaded.
- Keeping wet trades to a minimum significantly shortens the entire construction process.
- Thanks to precast technology and an efficient site crew, a single-storey house can be erected in 1–2 days.
- Walls need no seasoning. Follow-on works can start just a few days after installation is complete.
- The indoor climate in homes built from our precast elements is friendly to allergy sufferers.
- Expanded clay concrete in the Formee system is non-combustible, chemically inert, and resistant to moisture, mould and fungi.
- Expanded clay concrete is a vapour-permeable material. Diffusion resistance should be determined for the specific material class and the complete build-up of the wall.
- Expanded clay is resistant to both high and low temperatures.
Formee
Formee was founded in 2021. Our company's first step was the strategic decision to build a modern precast concrete factory. In October 2021, full of enthusiasm, we began construction on a dedicated plot in the industrial park in Międzyrzecz.
Despite some challenges — including archaeological works on the purchased plot — our commitment and professionalism kept the work moving at pace. Determined, we pressed on with our mission, and in June 2022 the equipment was commissioned and the first precast concrete elements went into production.
An essential stage was the testing phase, during which every aspect of precast production was carefully thought through and fine-tuned. It was through this thorough, carefully planned work that the plant reached full functionality and began operating at full capacity. We are proud to say that the hand-over of finished products reached its peak in December 2022.
Building Formee has been a true team effort, in which every stage was not only a challenge but also an opportunity to develop new skills and refine our processes. Above all, we are guided by the ambition to provide our clients with the highest quality and professionalism at every stage of our cooperation.
Formee's stand at BUDMA 2024 received the Acanthus Aureus — the Poznań International Fair award for stands that best support the exhibitor's marketing strategy.
List of winners on budma.pl